The painters were hard at work today and did the final coats on the inside walls, a second coat on the cavity doors, the rear garage door, the window lintels, the alfresco, eaves & lower downpipes. They also did another coat of stain on the front door and stained the first 4 stairs (the rest of the stairs get painted).
Still to do are the battens and around the master bedroom windows. They will need a really long ladder for that!
I questioned them about the stain on the stacker door and pantry door, and it seems it is the wrong stain. Oops... another thing to get sorted.
A nice surpise is the linen shelves are in, as well as the wardrobe shelves and hanging rails, the bathroom, ensuite & powder room mirrors, and the shower screens! It may have been done yesterday but I didn't go looking. I forgot to take pics of the powder room and walk in linen off the laundry.
I may have to go shopping to fill the wardrobe ;) |
Elec fit out has begun! |
Ugly fan switch! Weird to have 2 different switches together. I have to find out tomorrow if the switches can be matched. Lighting shop says yes. Elec says doubtful. |
87 days to go!